China-Torque-Rod-Bushing-for-Heavy-Tracks-Auto-Parts-17257-56603-5542-Z2008-

Produce Torque Rod Bush for Truck:
Replace for: Nissan, HINO, ISUZU, MITSUBISHI.

Rubber Material EPDM, SBR, NBR, CR, NR according to your requirement
Metal Material DIN, ASTM, JIS, BS, NF, GB according to your requirement
Characteristic
Ozone resistant, High / Low temperature resistant / Aging resistant / Oil resistant / Insulation / Electric conduction / Elasticity / High tensile strength
According to your requirement
Rubber Hardness 50A-90A according to your requirement
Surface treatment parkerising, Polishing, galvanized, electroplating, spraying, and painting and zinc plated and so on
According to your requirement
Certification ISO/TS16949: 2009 OEM Grade
Tolerance? &L Min 0.02mm
According to your requirement
Packing Carton box / PP bag according to your requirement
MOQ 500 pieces
Delivery Time Sample: 7days
Mass: 15-45days According to your quantity
Remarking
Our factory is specialized in doing OEM/ODM products according to customer's drawings or samples.
Warrenty: 3 years or 50000KM (OEM Grade) 1 years (Marketing)
Any RFQ, Please feel free to send your drawings( CAD, PDF ) For quotation.
Torque Rod Bush for Truck:
1. Apply for Nissan, HINO, ISUZU, MITSUBISHI.
2. Material: Rubber.

Please feel free to contact us if you are interested in our products.

Chilled Water Air Handling Unit

Water chilled type, equipped with Air Cooled Water Chiller or Water Cooled Chiller to cool, heat the target and at the same time to purity the air, which will make people feel comfortable.

Amrta patented Air Handling Unit uses our newly developed patented structure; mainly constructed with air filter, heat exchanger, fan motor, fan blower and other main components; it can meet with different external pressure requirements; tight unit structure, light unit weight and good cooling/heating performance. Direct paneling assembly structure and the frame is made of patented alloy aluminum constructed structure, joined together as a cabinet frame system. Not only ensure the cabinet is air fight, but also eliminate thermal bridge and enhance the rigidity and strength of the unit. The products are of small size, low noise hence it Is widely applied in the comfortable Air Conditioning system such as the hotel, commercial building, office and underground railway application.

Operation & Maintenance
1.Before the unit operation, check the water pipe valves system and duct equipment. Make sure everything is under good condition.
2. Check the fan motor and blower moving parts regularly for their connection, operation and rotating direction. Readjust it if necessary.
3. Air filter cleaning should be carried out every month before and during operation.
4. During winter, coil water should be drained out if not operating. If the unit needs to operate during winter time, make sure when the unit stops running, the coil water must circle the system and the fresh air damper must be closed to prevent coil freezing. If the unit stops operation for a long duration, coil water must be drained out.
5. Clean soft water must be used for chilled water and hot water system. Every year, wafer chemical treatment must be performed to eliminate the contamination in the system and apply compressed air or wafer for cleansing the fin coil surface, drain pan and U-trap bend.
6. Regular checking must be performed for the motor bearing lubrication condition and belt tightness.

Chilled water air handling unit

Chilled Water Air Handling Unit

Chilled Water Air Handling Unit,Chilled Water Fresh Air Handling Unit,Recovery Chilled Water Air Handling Unit,Heat Chilled Water Air Handling Unit

Jinan Amrta Air Conditioning Co.,Ltd , https://www.amrtaac.com