Iron Hydraulic Waste Baler Machine is applicable in steel plants,recycling companies,ferrous & non-ferrous smelting industry to press metal scraps (steel, copper, aluminum, stainless steel, discarded automobiles).
1) Hydraulic drive,manual or PLC control.
4) Spare parts: supply one set of spare parts for free, tool box, operation book.
Iron Shavings Baler, Iron Turnings Baler, Waste Iron Baler, Sheet Iron Baler, Iron Scraps Baler Jiangyin Metallurgy Hydraulic Machinery Factory , https://www.eco-briquetter.com
1. Technical Process
Decoiler- Feeding with guide- Roll forming- Cutting - Products CollectingÂ
2. Technical Parameter
Â
Items
Specifications
Material of coil
Material Thickness
0.3-0.8mm galvanizedÂ
SizesÂ
Width and heightÂ
63*38mm and 89*41mm
De-coilerÂ
Weight
3 ton manual
PunchingÂ
NumberÂ
5 sets of punching moulds, two for the round holes, another for the dimple
screws, two for the rectangular holes
Forming system
Rolling Speed
10-12Â m/min
Â
Roller Stations
About 13 stations formingÂ
Â
Roller Material
Gcr15 Steel with quenching
Â
Shaft Material
45# Steel Diameter 75mm shaft
Â
Â
Maim Motor Power
7.5Â kw
Â
Hydraulic cutting Power
5.5Â kw
Cutting
systemMaterial Of Cutting
CR12 with quench treatment
Â
Hardness
HRC58-62
Â
Tolerance
+-1.5mm
Â
Cutting blade
1 set of cutting blade
Electrical control system
Electric Source
380V, 50HZ,3 phaseÂ
Â
Â
Control System
PLC with touch screen Japanese Panasonic and Yaskawa Brand
Â
WeightÂ
About 3 tonsÂ
Â
Way Of Drive
1 inch single chain
Â
Size of machine
Length 5500mm* Width 800mm* Height 1000m
3. Assembly and commissioning
One engineer will visit Buyer's workshop for install, commission and training, The customer should ensure the pre-installation being carried out appropriately. The buyer pays the round-trip air-tickets, local cost in buyer's workshop; buyer has to pay USD100 per day, per engineer.
4. Payment Term:T/T,L/C.
30% T/T in advance and 70% T/T after inspection before shipment.
Â
Warranty
 1. One year, and we will provide the technical support for the whole life.
 2. Training: the buyer should charge of visa, return ticket, food and accommodation,overseas and USD100/person/day for salary.
 3. Need one techniciansÂ
 4. Training time: one week (contains the time of installation and adjustment)
2) Bale-discharging:"turn-out","push-out","forward-out" .
3) No footing bolts needed in installation;diesel engine can be power.
Metal Stud/Track/Furring Channel Roll Forming Machine
Model NO.: RF-DW
Control System: PLC with Touch Screen
Place of Orgin: Wuxi, China
Delivery Time: 50 Days After Deposit
Package: Film and Steel
Trademark: Suhang
Transport Package: Film and Steel
Specification: CE, SGS, ISO9001: 2008
Origin: Wuxi, Jiangsu
HS Code: 8455229090
Metal Stud/Track/Furring Channel Roll Forming Machine