Bidding conditions for mining engineering projects and ways of implementing bidding

(1) Conditions for the bidding of mining engineering projects The construction party is allowed to conduct bidding for mining projects, which must meet the following requirements:
1. Construction project approval The mining project project must be a project that has been included in the resource development area by the state or local government, has survey reports and resource evaluations that meet the grade requirements, and environmental impact assessment reports, and has developed conditions and approved projects. .
2. Approval of the construction administrative department Has completed the design and drawing work that meets the construction requirements, and has been reviewed and approved by the corresponding safety department and environmental management department; fulfilled and completed the construction and construction procedures and approved by the administrative department.
3. Construction of funds to implement the construction funds have been implemented or partially implemented, in line with the funds rate; there are funds or bank loans related evidence.
4. Construction project planning permit The purchase of construction land has been completed, as well as the necessary temporary construction land planning and leasing work, and the construction project planning permission has been obtained.
5. Technical data meet the requirements Completion of the necessary supplementary survey work, geological data and corresponding design and drawings to meet the construction requirements. Wellbore construction must have wellbore inspection hole data that meets the requirements.
6. law, regulation, condition (b) provides the content and implementation of regulations tender tender 1. The tender mining construction tenders can tender for a project unit, such as mine, beneficiation plant, such as dedicated railways or highways, but also It can be a tender for one or several units of engineering content, such as a wellbore project, a roadway project, a factory building or an office building.
A mine project can be tendered separately for several unit projects. Projects of the same nature can be contracted by one or several construction units. Both forms have their own advantages and disadvantages. This involves the organizational capacity and construction capacity of the construction unit and the construction unit.
2. Ways of implementing bidding The bidding can be carried out by means of self-bidding or entrusted bidding. If the tenderer has the ability to prepare bidding documents and organize evaluation of bids, he may, after filing the case with the relevant administrative supervision department, handle the tendering matters on his own.