Yantai, Shandong "multi-table integration" acquisition construction completed 69,000

[China Instrument Network Instrumentation Industry] On January 9, the reporter learned from the Yantai Power Supply Company of the State Grid that Yantai City, Shandong Province has cumulatively completed construction of 69,000 pieces of "multiple-in-one" construction, covering 102 communities in the city, including water meter 5.3. Million, hot 16,000, the collection success rate reached 95%.

(Image from the Internet, invaded)
Multi-table combined collection and construction is a construction project integrating the collection of power supply, water supply, heating, and gas. It integrates the collection of water meters, heat meters, or gas meters in the existing technology of electricity collection and copying. Integration.
Since the start of this work in 2015, Yantai Power Supply Company has actively communicated with the local government and water supply and heating companies, and has signed 4 government support agreements and 6 water supply and heating business cooperation agreements, providing support for the solid development of multi-table construction. . In 2017 alone, the company completed the construction of 31.575 million multi-table collections and exceeded its annual construction tasks.
While guaranteeing the progress of multi-meter construction, Yantai Power Supply Company has set a multi-table acquisition success rate of 95% as the goal, discussed the development of a multi-table acquisition and promotion plan, and fully implemented it. Organize 13 secondary units for multi-table construction, sort out the multi-table construction technical materials in the jurisdiction area, collect more than 80 basic data such as multi-table manufacturers, technical agreements, concentrator manufacturers, and protocol versions, and face the problems faced by multi-table acquisition. Conduct technical exchanges, formulate problem solving solutions, select representative collection points to carry out scheme tests, and verify that the solutions are feasible, formulate remediation promotion plans, and handle remaining sample collection points one by one, accumulating a total of 4,700 multi-table user acquisition problems. After a four-month inspection and treatment, the success rates of water meter and hot meter collection were respectively increased from 43.39% and 34.12% in the middle of the year to more than 95%. At the same time, new parts of multi-table construction were further strengthened, and construction and collection quality management was further strengthened. Make sure to build a house and collect one.
In 2018, Yantai Power Supply Company will conduct follow-up observation on the collection equipment of the community, further combing and perfecting the collection and construction of “multiple forms”, ensuring the effective and stable collection of data, and effectively consolidating the achievements of the construction. Strengthen construction quality control, strengthen multi-table acquisition and maintenance, ensure multi-table collection success rate of over 97%, and provide accurate data.
(Original Title: Yantai "Multi-table Integration" acquisition and construction completed 69,000)

LED Flood Light

The classification mainly includes the aluminum or zinc alloy die casting Machinery Parts using in LED Flood Light area.
In the die casting process,higher specific pressure is required,so that higher filling speed can be obtained.which is beneficial for alloy to overcome mold filling resistance.and effectively fill each part of the cavity.The Casting General Tolerance is Grade GB-CT4.
Process Technology: High pressure die casting,Shot Blasting,NC Machining,Spray Coating
Product Dimensions: Customized
Casting General Tolerance: Grade GB-CT4
Flow Processes: Die casting,Degating,Polishing and Deburring to remove the burrs,Polishing to remove the parting line,flash,CNC Turning, Cleaning, Packaging, Storaging, Shipping
Control Measure: Incoming Material Test, First Article inspection,Routing inspection,Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper,Plug Gage,Screw Gauge
Application: Lighting Parts
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo

Alumimum Casting LED Flood Light Parts,Die Casting Parts for LED Flood Light,Zinc Die Casting LED Flood Light Parts

NINGBO ZHENHAI BOLANG METAL PRODUCTS FACTORY , https://www.casting-part.com